2023 was a very creative year for the SolarWay team. During the year, he commissioned more than 70 photovoltaic systems. Among them are photovoltaics in Residences, Schools, Commercial Enterprises, Hotels, Olive Mills, etc.

In addition to these, another 25 photovoltaic systems have been completed in 2023 and await their activation by DEDDIE, while at the same time, more than 60 new photovoltaic systems are underway or waiting to start.

In detail, the activations that took place in 2023 are:

  • Photovoltaic self-consumption (net-metering) system of power 2.46 kWp on the roof, activated on 2/1/2023, in the Messinia Knots.
  • Photovoltaic self-consumption (net-metering) system of power 7.38 kWp on a pergola, activated on 3/1/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 14.35 kWp on an industrial roof, activated on 4/1/2023, in Vlazopoulos, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.92 kWp on roof, activated on 4/1/2023, in Koroni, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 11.88 kWp on roof, activated on 4/1/2023, in Kamaria, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.51 kWp on the roof, activated on 4/1/2023, in Grizokampos, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 5.33 kWp on the roof, activated on 17/1/2023, in Oropos Attica.
  • Photovoltaic System of self-generation of 7.38 kWp on a pergola, activated on 19/1/2023, in Neohori Manis.
  • Photovoltaic self-consumption (net-metering) system of power 2.46 kWp on the roof, activated on 6/2/2023, in Grizokampos, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 9.84 kWp on roof, activated on 2/24/2023, in Megalopolis.
  • Photovoltaic self-consumption (net-metering) system of power 3.28 kWp on a pergola, activated on 4/3/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 4.92 kWp on a pergola, activated on 4/3/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 8 kWp on the ground, activated on 9/3/2023, in Kamaria, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 2.87 kWp on roof, activated on 13/3/2023, in Livadakia, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 49.61 kWp on an industrial roof, activated on 14/3/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 12,015 kWp on the roof, activated on 16/3/2023, at the headquarters of TERNA S.A. in the Athens Vineyards.
  • Photovoltaic self-consumption (net-metering) system of power 4.92 kWp on roof, activated on 23/3/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 6.56 kWp on roof, activated on 8/4/2023, in Verga, Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 7.79 kWp on roof, activated on 10/4/2023, in Schinia, Attica.
  • Photovoltaic self-consumption (net-metering) system of power 9.84 kWp on roof, activated on 20/4/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 7.38 kWp on roof, activated on 10/5/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 9.43 kWp on roof, activated on 12/5/2023, in Gialova Messinia. The photovoltaic system has a battery.
  • Photovoltaic self-consumption (net-metering) system of power 4.92 kWp on roof, activated on 13/5/2023, in Kalamata.
  • Photovoltaic System of self-production power 4.92 kWp on roof, activated on 16/5/2023, in Evangelismos, Messinia. The photovoltaic system has a battery.
  • Photovoltaic self-consumption (net-metering) system of power 8.2 kWp on the ground, activated on 17/5/2023, in Monemvasia, Laconia.
  • Photovoltaic self-consumption (net-metering) system of power 6.15 kWp on roof, activated on 24/5/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 2.05 kWp on roof, activated on 31/5/2023, in Skala Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 2.94 kWp on roof, activated on 6/6/2023, in Hadriani, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 13,695 kWp on roof and wall, activated on 9/6/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 4.1 kWp on roof, activated on 12/6/2023, in Megali Mantineia, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.92 kWp on the roof, activated on 16/6/2023, in Gialova, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.92 kWp on the roof of a parking space, activated on 6/20/2023, in Methoni, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 6.15 kWp on roof, activated on 21/6/2023, in Megali Mantineia, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 2.46 kWp on the roof, activated on 6/21/2023, in Logga, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.86 kWp on the roof, activated on 28/6/2023, in Avramiou, Messinia. The photovoltaic system has a battery and has been subsidized by the “Photovoltaics on the roofs” program.
  • Photovoltaic self-consumption (net-metering) system of power 4.1 kWp on the roof, activated on 1/7/2023, in Pyla, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 14.8 kWp on roof, activated on 20/7/2023, in Akritochori, Messinia.
  • Photovoltaic System of self-generation of 1.08 kWp on the roof of a parking space, activated on 20/7/2023, in Methoni, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 50.02 kWp on an industrial roof, activated on 7/26/2023, in Sterna, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.48 kWp on pergola, activated on 1/8/2023, in Petrochori Mani. The photovoltaic system has a battery.
  • Photovoltaic self-consumption (net-metering) system of power 46,895 kWp on roof and roof, activated on 2/8/2023, in Marathopoli, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 13.6 kWp on the roof, activated on 1/9/2023, in Akritochori, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 3.75 kWp on the roof, activated on 7/9/2023, in Stoupa Mani.
  • Photovoltaic self-consumption (net-metering) system of power 5.85 kWp on the roof, activated on 16/9/2023, in Livadakia, Messinia. The photovoltaic system has a battery.
  • Photovoltaic self-consumption (net-metering) system of power 2.46 kWp on a pergola, activated on 16/9/2023, in Schinolak, Messinia. The photovoltaic system has a battery.
  • Photovoltaic self-consumption (net-metering) system of power 2.49 kWp on the roof, activated on 16/9/2023, in Finiki, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 2.49 kWp on the roof, activated on 16/9/2023, in Achladochori, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 6.56 kWp on roof, activated on 26/9/2023, in Kamaria, Messinia.
  • Photovoltaic System of self-generation of 6,225 kWp on the roof of a parking space, activated on 1/10/2023, in Methoni, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 5 kWp on roof, activated on 4/10/2023, in Kalamata.
  • Photovoltaic System of self-generation of 6.56 kWp on the roof of a parking space, activated on 4/10/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 3.69 kWp on the roof of a parking space, activated on 6/10/2023, in Gialova, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4 kWp on the roof, activated on 6/10/2023, in Koutifari, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.92 kWp on roof, activated on 15/10/2023, in Dara, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 5.74 kWp on roof, activated on 15/10/2023, in Methoni, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.2 kWp on roof, activated on 15/10/2023, in Finiki, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 13.44 kWp on roof, activated on 25/10/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 5.04 kWp on the ground, activated on 30/10/2023, in Koroni, Messinia.
  • 12,035 kWp self-generation photovoltaic system on roof, activated on 6/11/2023, in Kalamata.
  • Photovoltaic system of self-production power 4.98 kWp on the roof, activated on 7/11/2023, in Meligala Messinia. The photovoltaic system has a battery and has been subsidized by the program “Photovoltaics on the roofs”.
  • Photovoltaic self-consumption (net-metering) system of power 3.78 kWp on the roof, activated on 11/11/2023, in Neohori Mani.
  • Photovoltaic System of self-production power 10.08 kWp on the roof, activated on 11/11/2023, in Verga, Kalamata. The photovoltaic system has a battery and has been subsidized by the “Photovoltaics on the roofs” program.
  • Photovoltaic self-consumption (net-metering) system of power 3.69 kWp on roof, activated on 21/11/2023, in Karteroli, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 6,225 kWp on the roof, activated on 22/11/2023, in the Diocese of Messinia.
  • Photovoltaic System of self-production power 6,225 kWp on the roof, activated on 1/12/2023, in Kardamili, Messinia. The photovoltaic system has a battery and has been subsidized by the program “Photovoltaics on the roofs”.
  • Photovoltaic self-consumption (net-metering) system of power 5.1 kWp on roof, activated on 11/12/2023, in Anthia, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 4.2 kWp on the roof, activated on 11/12/2023, in Kalamata. The photovoltaic system has a battery and has been subsidized by the program “Photovoltaics on the roofs”.
  • Photovoltaic self-consumption (net-metering) system of power 2.55 kWp on the roof, activated on 11/12/2023, in Agios Konstantinos Messinias. The photovoltaic system has a battery and has been subsidized by the “Photovoltaics on the roofs” program.
  • Photovoltaic System of self-production power 7.56 kWp on the roof, was activated on 12/12/2023, in Petalidi, Messinia. The photovoltaic system has a battery and has been subsidized by the program “Photovoltaics on the roofs”.
  • Photovoltaic self-consumption (net-metering) system of power 3.69 kWp on a pergola, activated on 28/12/2023, in Logga, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 5.04 kWp on roof, activated on 28/12/2023, in Kalamata.
  • Photovoltaic self-consumption (net-metering) system of power 3.69 kWp on the ground, activated on 29/12/2023, in Finiki, Messinia.
  • Photovoltaic self-consumption (net-metering) system of power 2.49 kWp on the roof of a parking space, activated on 29/12/2023, in Kamaria, Messinia.
Μοιραστείτε αυτό το άρθρο